A deck reaches the point where rebuilding it costs less than keeping it. When that day comes, the deck has to come off cleanly: boards stacked and hauled, footings pulled, and the ledger board taken off the house so water stops getting behind the siding.
- From $1,000
- Haul-away included
- Footings and posts pulled
Why homeowners remove a deck
Decks fail from the inside. A Rochesters winter freezes and expands the ground, summer rain soaks the rim joists, and after enough cycles the ledger attachments and the posts below grade are the weak points. By the time boards feel soft underfoot, the framing underneath is usually further gone than it looks.
The other reason is simpler: the deck no longer matches how the yard gets used. A raised deck off a kitchen door that nobody sits on is dead space. Taking it out is the cheapest way to get a level yard back for a patio, a garden, or grass that a mower can actually reach.
What we remove
- Pressure-treated wood decks, including older decks built with nails rather than screws
- Composite and capped composite decking
- Cedar and hardwood decks
- Deck stairs, railings and guard posts
- Built-in benches, planters and skirting
- Concrete pier footings and sono-tube bases
Signs it is time
- Boards that are soft, splintering or springing underfoot
- Railing or guard posts that move when you lean on them
- Posts that are rotted at or below the ground line
- A ledger board pulling away from the house, or staining behind it
- Stairs that have settled unevenly away from the deck
- A deck you have stopped using because maintaining it is no longer worth it
Our deck removal process
- Project review and quotePhotos of the deck, the access path and the ground under it are usually enough to quote. Anything with a roof over it, a hot tub on it, or a steep drop gets looked at in person first.
- Protect the work areaMats go down along the haul path, and anything the deck is close to — siding, a fence, a window well — gets covered before the first board comes off.
- Dismantle from the top downDecking comes up first, then railings, then the framing. Nails and screws are pulled or ground flush as we go so the yard is not left seeded with sharp metal.
- Remove the footingsConcrete piers get dug out and hauled rather than buried. The ledger is unbolted from the rim joist and the fastener holes are sealed.
- Load, haul and cleanMaterial is carried to the trailer, sorted, and hauled out. The site is raked, swept with a magnet for fasteners, and left ready for the next trade.
Special considerations
- Footings get pulled, not buried. Burying them just moves the problem to the next owner, or to the machine that digs there next.
- The ledger board is the part most crews skip. Leaving it bolted to the rim joist traps water behind the siding, which is exactly the failure that ends decks early.
- If you want the lumber salvaged, say so before the work starts — taking a deck apart to reuse is slower than taking it apart to haul.
- A hot tub or a screened roof makes it a different job: the tub has to be disconnected and drained, and any electrical work is done by a licensed electrician first.
What happens to the space afterward?
Once the deck is gone you have a level area and a clean wall. Most homeowners put a patio or a gravel sitting area back in the same footprint, because the door still wants somewhere to go. Some choose lawn, which is the cheapest option and the easiest to maintain. If a new surface is going in, the removal and the install should be sequenced together so the base can be prepared while the deck framing is still out of the way.
If a replacement surface is going in, we sequence the removal around it — and say so before the work starts.
What deck removal costs in Rochester
We do not publish prices we cannot stand behind, because the number depends on what is actually on site. Residential removal projects generally have a $1,000 minimum project value. What moves the quote:
- Size and height of the deck — a low deck is a short haul; a raised deck means stairs and a longer carry
- Access: gate width, distance from the trailer, and whether the ground is soft enough to mark
- Railing, stairs and built-in features, which come apart piece by piece
- Footings: how many, how deep, and whether they are concrete piers or sono-tubes
- Composite and hardwood decks, which are heavier and go to a different disposal stream than treated lumber
How to get an accurate number
Send photos of the structure, the ground around it and the path a trailer would take to reach it. Add rough dimensions if you have them. Most jobs are quoted from that alone; anything structural or unusual gets looked at first.
Start a quoteDeck Removal FAQs
Do you pull the concrete footings under the deck?
Yes. They are dug out and hauled with the rest of the material. Leaving them behind means the next project — a patio, a shed, a garage — hits them, and the lawn never settles flat over them.
What happens to the ledger board attached to my house?
It comes off and the bolt holes are sealed. A ledger left on the wall holds moisture against the siding and rots the rim joist behind it, which is one of the more expensive things to fix later.
Can you take the deck apart so I can reuse the lumber?
Yes, if you tell us before we start. Careful dismantling takes longer than demolition and the quote reflects that, but the boards come down intact rather than broken.
How long does a deck removal take?
A typical residential deck is a one-day job: tear-out, footing removal and haul in the same visit. Large multi-level decks, or ones with a roof, run into a second day.
Do you remove the deck if there is a hot tub on it?
Yes, as part of the job. The tub has to be drained and disconnected first, and any hard-wired electrical is disconnected by a licensed electrician before we touch the structure.
Will removing the deck damage my siding or the lawn?
That is the part we plan around. Mats go down on the haul path, siding near the ledger is protected, and fasteners are swept up with a magnet before we leave.
Can you remove the deck and the fence at the same time?
Yes, and it is usually cheaper to do both in one mobilisation. We quote multiple structures at one address as a single project.
Related removals
- Fence RemovalFence removal in Rochester, NY.Details
- Shed RemovalShed removal in Rochester, NY.Details
- Wooden Porch RemovalWooden porch removal in Rochester, NY.Details
- Patio RemovalPaver, brick, flagstone and stone patio removal in Rochester, NY.Details
- Concrete Patio RemovalConcrete patio removal in Rochester, NY.Details
Other services
- Wheelchair Ramp Removal in Rochester, NY
- Gazebo Removal in Rochester, NY
- Pergola Removal in Rochester, NY
- Playset Removal in Rochester, NY
- Treehouse Removal in Rochester, NY
- Driveway Removal in Rochester, NY
- Sidewalk Removal in Rochester, NY
- Pool Deck Removal in Rochester, NY
- Retaining Wall Removal in Rochester, NY
- Landscape Timber Removal in Rochester, NY
- Asphalt Removal in Rochester, NY
- Above Ground Pool Removal in Rochester, NY
- Hot Tub Removal in Rochester, NY
- Greenhouse Removal in Rochester, NY
- Carport Removal in Rochester, NY
See all removal services, our service area, or read common questions before you call.
Deck Removal across our service area
Same work, different lots and access in each town. Pick yours for the local detail.
- Deck Removal in Rochester
- Deck Removal in Greece
- Deck Removal in Gates
- Deck Removal in Spencerport
- Deck Removal in Hilton
- Deck Removal in Brockport
- Deck Removal in Hamlin
- Deck Removal in Holley
- Deck Removal in Kendall
- Deck Removal in Webster
- Deck Removal in Irondequoit
- Deck Removal in Henrietta
- Deck Removal in Chili
- Deck Removal in Brighton
- Deck Removal in Penfield
- Deck Removal in Fairport
- Deck Removal in Pittsford
- Deck Removal in Victor
- Deck Removal in Parma
- Deck Removal in Ogden
Ready to remove your deck?
Send a photo and the access width. Residential projects start at $1,000.